We work closely with all stakeholders and project teams to identify potential geotechnical hazards and provide sound, technical solutions.

Proactive environmental, health, and safety compliance management reduces business risk. However, we know that maintaining compliance can be time-consuming and require a breath of expertise that may be difficult to maintain in-house.

Our team of regulatory experts can assist you with developing, reviewing, auditing, implementing, and improving a full-range of compliance management programs to meet environmental, health, and safety regulations, as well as your corporate standards. Our goal is to be an extension of your team, offering a highly responsive, clearly thought-out, experienced approach to solving business-sensitive compliance issues.

BVHS-Fault-trench-2
Verdantas-RGB-Color-Logomark

Our Experience

{id=116339472256, createdAt=1684523166725, updatedAt=1687271645800, path='del-mar-bluffs', name='Del Mar Bluffs', 1='{type=string, value=Del Mar Bluffs}', 33='{type=number, value=1}', 34='{type=list, value=[{id=12, name='Geotechnical and Geological Engineering', order=6, label='Geotechnical and Geological Engineering'}]}', 35='{type=string, value=North County Transit District}', 4='{type=string, value=Read how geotechnical services kept the North County Transit District/Amtrak scenic route safe for riders.}', 36='{type=string, value=Del Mar, CA}', 5='{type=list, value=[{id=20, name='Transportation', order=5, label='Transportation'}]}', 37='{type=list, value=[{id=114, name='Geotechnical Engineering', order=65, label='Geotechnical Engineering'}, {id=117, name='Geotechnical Testing', order=68, label='Geotechnical Testing'}]}', 8='{type=string, value=

The North County Transit District/Amtrak route is a scenic one as it travels between the surf and coastal bluffs. Beautiful for the rider, unless the train is stopped due to the coastal bluff deterioration, slope failures and landslides that occurred adjacent to the railway, and prevented the trains from passing through.

In April 2001, a 40-foot section of concrete retaining wall collapsed, a wall that had lined the top of the Del Mar Bluffs at 7th Street. The failure, which had been identified in the completed Del Mar Bluffs Geotechnical Study as one of the highest risk areas, consisted of three wall sections approximately 60 feet above the beach.

To keep trains running atop the bluffs, the North County Transit District (NCTD), which owns the tracks, declared an emergency and approved spending $1,050,000 to design both immediate and long-term repairs to the portion that gave way. In addition, funding for mid-term measures, that could cost as much as $8.2 million on other high-risk portions of the bluff, were also approved. These measures are intended to ensure that the Amtrak and Coaster trains that run along the 1.6-mile-long section will be able to do so for the next 20 years.

In response to the emergency, our experts assessed the geological conditions and provided emergency repair alternatives for local agency review. With the selection of a shear-pin stabilization method, a “fast-track” analysis, the design and review period was successfully completed within 30 days. Construction of the stabilization system, twelve 60-foot-deep shear pins with tie-backs, was then successfully completed within 45 days.

Prior to this emergency, our geotechnical report had informed the NCTD that saturation from groundwater is/was the biggest problem facing Del Mar’s bluffs. The report predicts that, without reinforcing measures along at least half of their length, the bluffs will erode another 12 feet within the next 20 years, making them even more fragile. Specifically, our report had identified the area (at 7th Street) that failed as a high-risk zone.

The railroad tracks were first built along the bluffs in 1910. Because of population growth, runoff from irrigation has increased tremendously, saturating Del Mar’s bluffs with groundwater and causing them to erode faster than they otherwise would. (Leighton’s study showed that normal rainfall in the San Diego County would dump about 10 inches on Del Mar Bluffs, but with the increased runoff, water reaching the bluffs each year is equivalent to between 100 and 200 inches of rain.)

Improvements constructed included additional shear pins, soil cement improve­ments, sea walls at the base of the bluffs, reinforcing the bluffs, and improving surface and sub-surface drainage, all with site aesthetics as a key element.

The selected stabilization method included additional shear pins connected at the top by a reinforced grade beam with tie backs. Where improvements are exposed they have been boulder-scaped to match the adjacent bluffs. Site stabilization also included the installation of a deep cut off subdrain which was outletted by boring through the bluff to the beach below and exiting through a boulder-scaped outlet.

Leighton has continued to provide geotechnical services since that first report, including the Thanksgiving 2019 failure.

}', 13='{type=image, value=Image{width=1600,height=1200,url='https://www.verdantas.com/hubfs/Projects/Del-Mar-Bluffs/DelMar2-scaled-1.jpg',altText=''}}', 15='{type=image, value=Image{width=1000,height=750,url='https://www.verdantas.com/hubfs/Projects/Del-Mar-Bluffs/Del-Mar-Bluffs-1000PX.jpg',altText=''}}', 17='{type=image, value=Image{width=1536,height=1152,url='https://www.verdantas.com/hubfs/Projects/Del-Mar-Bluffs/DelMar3-1536x1152.jpg',altText=''}}', 19='{type=image, value=Image{width=1506,height=1193,url='https://www.verdantas.com/hubfs/Projects/Del-Mar-Bluffs/DelMar4.jpg',altText=''}}', 25='{type=number, value=0}', 27='{type=number, value=0}', 29='{type=number, value=6}'}
Geotechnical and Geological Engineering
Del Mar Bluffs

Read how geotechnical services kept the North County Transit District/Amtrak scenic route safe for riders.

{id=116348176162, createdAt=1684523985634, updatedAt=1687271598885, path='on-call-environmental-site-assessment-remediation-services', name='On-Call Environmental Site Assessment & Remediation Services', 1='{type=string, value=On-Call Environmental Site Assessment & Remediation Services}', 33='{type=number, value=1}', 34='{type=list, value=[{id=12, name='Geotechnical and Geological Engineering', order=6, label='Geotechnical and Geological Engineering'}]}', 35='{type=string, value=Port of Los Angeles}', 4='{type=string, value=Providing screening reports, remediation workplans, compliance monitoring of soil management plans to support the Port's capital improvements.}', 36='{type=string, value=Los Angeles, CA}', 5='{type=list, value=[{id=19, name='Government', order=4, label='Government'}]}', 37='{type=list, value=[{id=120, name='Environmental Consulting', order=71, label='Environmental Consulting'}]}', 8='{type=string, value=

The Port’s planned $1 billion dollars investment in capital improvements will ensure its continued ability to provide superior cargo terminals and rail and warehouse infrastructure, as well as attract top business tenants from around the world. As each capital project is planned, potential hazardous materials are addressed.

Our team has completed 20 project directives under a multi-year on call contract with the Port. Various regulatory agencies can be engaged in each directive such as Los Angeles Regional Water Quality Control Board, US EPA, Department of Toxic Substances, and Los Angeles County Fire Department.

It is our expert's role to provide the Port screening reports, produce and implement remediation workplans, monitor compliance of soil management plans, and communicate their position to other Port divisions.

Three work orders to provide construction monitoring have been completed. For one, within the Kopper’s area for the Berth 200 Project, we provided soil and air monitoring services and ensured that all elements of the Port’s Waste Management Plan (WMP), Soil Management Plan (SMP), Sampling and Analysis Plan (SAP), and Health and Safety Plan (HASP) were implemented by the various contractors. Leighton also sampled the stockpiles generated during the construction activities and assisted the Port to characterize, profile, and dispose the impacted soil and groundwater that was generated during the construction activities.

The Berth 200 Rail Yard switching and classification yard is used by Union Pacific Railroad, Burlington Northern Santa Fe Railroad Railway, and Pacific Harbor Line Railroad.

}', 13='{type=image, value=Image{width=1000,height=667,url='https://www.verdantas.com/hubfs/Projects/Leighton/City-of-Los-Angeles-Harbor-Department-On-Call-Environmental-Services-1000px.jpg',altText=''}}', 25='{type=number, value=0}', 27='{type=number, value=0}', 29='{type=number, value=6}'}
Geotechnical and Geological Engineering
On-Call Environmental Site Assessment & Remediation Services

Providing screening reports, remediation workplans, compliance monitoring of soil management plans to support the Port's capital improvements.

{id=116348310901, createdAt=1684524670902, updatedAt=1687271589782, path='mars-deep-space-station-14', name='Mars Deep Space Station 14', 1='{type=string, value=Mars Deep Space Station 14}', 33='{type=number, value=1}', 34='{type=list, value=[{id=12, name='Geotechnical and Geological Engineering', order=6, label='Geotechnical and Geological Engineering'}]}', 35='{type=string, value=Jet Propulsion Laboratory}', 4='{type=string, value=Geotechnical Engineering helped to confirm if temporary supports could support a 229 foot diameter antenna used for tracking spacecraft}', 36='{type=string, value=Mojave Desert, CA}', 5='{type=list, value=[{id=19, name='Government', order=4, label='Government'}]}', 37='{type=list, value=[{id=114, name='Geotechnical Engineering', order=65, label='Geotechnical Engineering'}]}', 8='{type=string, value=

The Goldstone Deep Space Communications Complex, located in the Mojave Desert, is the site for the Mars Deep Space Station 14 (DSS 14) a 229 foot diameter antenna that tracks spacecraft. Its most eye-catching element is its parabolic dish, weighing nearly 4,000,000 pounds. For the STEM minded, tours are available through the Goldstone website: www.gdscc.nasa.gov.

Repairs to the hydrostatic bearing supporting the antenna, required lifting the dish raising it and then dropping it down onto three temporary, 40-foot-tall support legs.

Our team was contracted by the structural engineer to assess if three existing temporary support foundations, used to support the antenna when it was 64-meters in diameter, could now be used to support the enlarged antenna while repairs were made.

The performance of the antenna was critical, and height movement was restricted within 1/8”. We recommended that the temporary support foundation movement be measured at all three supports during full dead loading. Linear Variable Differential Transformer (LVDT) displacement transducers or similar instrumentation was suggested to be installed during initial loading up to the full dead weight, to measure temporary support foundation displacement relative to the DSS 14 permanent reinforced concrete base. This instrumentation is expected to have a relatively low cost compared to the cost of the antenna and risk of this operation.

}', 13='{type=image, value=Image{width=1000,height=442,url='https://www.verdantas.com/hubfs/Projects/Leighton/Jet-Propulsion-Laboratory-Mars-Deep-Space-Station-14-1000px.jpg',altText=''}}', 25='{type=number, value=0}', 27='{type=number, value=0}', 29='{type=number, value=6}'}
Geotechnical and Geological Engineering
Mars Deep Space Station 14

Geotechnical Engineering helped to confirm if temporary supports could support a 229 foot diameter antenna used for tracking spacecraft