Verdantas is working with Tuppers Plains – Chester Water District (TPCWD) to complete their Phase 10 Water System Improvements

The improvements include approximately 45,600 feet of 12, 10” and 8” waterline replacement, a new 250,000-gallon elevated water storage tank and a new above-grade 500 gpm booster station. In addition, the project includes system-wide water meter replacement of approximately 5,200 residential and commercial meters.

Verdantas is providing project administration, survey, detailed design, permitting, bidding, construction administration and construction observation services on this nearly $6.9 million project. The project involved coordination and permitting with ODOT, Meigs County Engineer and townships for work along and across roadways including U.S. Route 33 and also Prater Engineering for electrical design.

The project was ranked #18 among Ohio EPA’s Water Supply Revolving Loan Account statewide projects and will receive 50% of those funds in principal forgiveness with the balance in 0% interest loan. The project also received $250,000 in an Appalachian Regional Commission Grant.

 

Ready to build a better tomorrow?