Decades of erosion had dramatically changed Clark and Delaware/Horseshoe Islands in the Maumee River. Clark Island had lost approximately 95% of its land mass since the 1940s, while Delaware/Horseshoe Islands lost roughly 40% between 1963 and 2020. The decline reduced valuable habitat and left the islands and shoreline previously protected by the islands increasingly vulnerable to river flows, waves, and seasonal ice.
Working with the Toledo-Lucas County Port Authority, Verdantas led the engineering, design, community engagement, permitting, and construction oversight for a $13.5 million effort to restore and enhance more than 83 acres of island, wetland, shoreline, and open-water habitat. Funding was provided through the Ohio Department of Natural Resources’ H2Ohio program and the U.S. Environmental Protection Agency’s Great Lakes Restoration Initiative.
Restoring the islands required more than rebuilding what had been lost. The design needed to perform within an active river system subject to changing flows, wave energy, and ice forces while supporting ecological recovery, nutrient reduction, and nearby recreational uses. Advanced hydraulic modeling helped the team understand these conditions and develop a design combining engineered and nature-based solutions, including reconstructed island footprints, rock and vegetated shoreline stabilization, wetland restoration, invasive species management, and native plantings.
The project included approximately 8,400 linear feet of perimeter rock revetment and 7,600 linear feet of interior bank protection to reduce erosion, with rock, wood, and native vegetation incorporated to create stable, ecologically functional shoreline and habitat. The restored island footprints also provide greater protection from wind and waves for approximately 3,500 linear feet of adjacent shoreline and recreational infrastructure.
Reusing Materials to Support Restoration
One of the project’s most distinctive elements was the reuse of material from the decommissioned I-75 DiSalle Bridge causeway. Verdantas worked with Mark Haynes Construction to approve a process for sorting, testing, and repurposing approximately 50,000 cubic yards of material for island reconstruction and stabilization. Reusing material already available near the project reduced the need for newly quarried resources and imported fill while limiting waste and transportation impacts.
The completed project restored and enhanced more than 83 acres of riverine habitat, including approximately 19 acres of wetland restoration and more than 50 acres targeted for invasive species management. More than 200,000 native plants, 1,200 trees, and 300 woody habitat features were incorporated throughout the restoration. Developed with input from more than 200 stakeholders, the improvements are designed to reduce erosion, encourage sediment deposition, improve water quality through nutrient capture and filtration, and provide stronger habitat for aquatic species.
By bringing engineering and ecological restoration together, the project rebuilt critical habitat and will help reduce nutrient flows into Lake Erie while creating a more resilient river system for the future. The work was recognized with an ENR Midwest Regional Best Projects Award of Merit in the Water/Environment category, highlighting an approach that balanced environmental restoration, technical performance, and long-term community value. It also recently received the 2026 American Port Authority Association Lighthouse Award for Excellence in Environmental Practices in the Large Port category.
Solution
River and Flow-Related Solutions
Expertise
Natural Resources & Environmental Planning
Geotechnical & Geological Engineering
Hydrology, Hydraulics, & Fluids
Market
Client
Toledo-Lucas County Port Authority
Location
OH